Built for quarter-hours by the million. Every function is an MCP tool and an API: your staff, your control system and your agents work with the same rights, approvals and logs.
t
I am Tura. Name the goal, I find the way. You are looking at Musterdorf, Quartura’s demo world; everything here is simulated. Tap a question whenever you like.
This is what the data state of a simulated grid area looks like right now:
Metering events processed since 1 October 2026
26,894,309,904
Import daily at 06:00 · 57,600,000 values per day (300,000 metering points × 2 directions × 96)
Throughput
9,500 per second
2 silos · Import segment 17
Queue
178,380 events
Lead time ≈ 18.8 s
Received
Metering point
Quarter-hour
kWh
Value status
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
Data state of 3 November · 300,000 metering points
W true value E substitute value V provisional G disturbed F missing
Billable (W and E): 98.11 %HES segment North 01–07 without data, communication fault 09–10, hourly-read meters are missing until the next import. Substitute values per MC-CH 2025 §6.3; G and F are never sent.
Simulation · illustrative values
Musterdorf read
The path of a rule change, proposed here by an agent:
Substitute value formation · interpolation limit 2 h → 3 hproposed by an agent, decided by people, computed by deterministic code
1ProposalAgent “Measurement data” on behalf of the head of meteringInterpolation up to 2 h → 3 hrules.explain
2BranchCopy of the rule set, existing data unchangedBranch ersatzwert-3hbranch.open
3Re-runOctober against 300,000 metering points, as of today57.6 m values per daybranch.runHarness
4Differencemain against Branch: values and aggregates226,440 quarter-hours F → Ebranch.compare
5Change requestwith evidence and checks, four-eyes approval1 warning, 0 blockschange.submit
6Activenew rule set valid from 1 NovemberRule set hash 9f3c…a1change.status
October 2026 · impact estimate
main
Branch
Difference
Quarter-hours F
412,680
186,240
−226,440
Quarter-hours E
3,214,560
3,441,000
+226,440
LGS/LE series changed
–
37 of 2,880
37
Billable (W and E)
99.63%
99.64%
+0.01 pp
Grid usage OctoberRoadmap
CHF 10,284,610.35
CHF 10,291,403.55
+CHF 6,793.20
Warn Interpolation beyond 2 h deviates from MC-CH 2025 §6.3 (default rule, deviation allowed with a reason)
Info Takes effect on 1 November; the October figures are an impact estimate, earlier periods stay unchanged as of their capture.
Approved by the head of metering. Proposal, evidence, approval and rule set are in the audit log; the agent is logged with the responsible person.
Musterdorf read
Why this matters to you:
MCP first: Every capability starts as a tool; the interface uses the same ones. Your model, your agent: no AI provider hard-wired.
AI with limits: Agents propose, deterministic code checks and computes. Every action of an agent is logged with the responsible person.
Branch before approval: Rule and tariff changes, including an agent’s, run against your data first: difference per metering point and aggregate, then approval with evidence.